|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| Material: | Sponge |
| Quantity: | Custom |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency




Dual-Sided Design |
· Strong Scrub Side - green Needle-punched abrasive layer for burnt-on, dried-on and baked-on food. · Soft Foam Side - yellow Soft absorbent foam for everyday washing-up, wiping and rinsing. · All in One One pad replaces a separate scourer and a separate wiping sponge. |


Uses & Applications | |
Scenario | Description |
Home kitchens | Daily washing-up of pots, pans, dishes and cutlery, plus burnt-on stains on cookware and baking trays. |
Food service and restaurants | High-volume dishwashing, grill and griddle cleaning, and back-of-house surface wiping. |
Hotels and catering | Pan, tray, urn and worktop cleaning for kitchens with heavy daily turnover. |
Supermarkets and discounters | Retail-ready packs in four standard sizes for the household cleaning aisle. |
Importers and wholesalers | Bulk and private-label programmes with custom sizes, colours and packaging. |
Janitorial and institutional | Canteens, schools, hospitals and office kitchens that buy cleaning consumables in volume. |
Metalware and utensil care | Uncoated stainless steel, iron and enamel cookware where abrasive cleaning is required. |
Specifications | |
Product name | Kitchen Scouring Sponge / Dual-Sided Abrasive Cleaning Sponge |
Structure | Abrasive scouring layer bonded to soft foam layer |
Abrasive layer | Needle-punched, spray-bonded scouring pad |
Abrasive layer colour | Green |
Foam layer | Soft foam |
Foam layer colour | Yellow (customizable) |
Shape | Rectangular |
Standard sizes | 9 x 6 x 2.5 cm / 9 x 6 x 3 cm / 10 x 7 x 3 cm / 11 x 7 x 3 cm (customizable) |
OEM / ODM | Available - logo, size, colour, packaging, private label |
HS code | 392490 |
Port of loading | Ningbo, China |
Delivery time | About 25 days after receipt of payment |
LCL consolidation | Available |







